Evaluada

iXora

star star star
help_outline

'Time points' are awarded according to the adequacy of the solution with the type of innovations sought by Time for the Planet. They correspond to the analysis of several factors :

  • impact potential: impact average score > 4 => 0,5 point / if > 4,15 => 1 point.
  • global consistency: all average score of the 6 selection criteria > 2,5 => 1 point.
  • the favourite: % of assessments judge the innovation as a top one to act on a global scale against greenhouse gases > 20% => 1 point
  • the targeting: validation of Time for the Planet scope of action higher than 90% => 0,5 point + innovation level of maturity is enough => 0,5 point
  • social acceptability: semantic analysis score of comments > 0 => 0,5 point/ if > 3500 => 1 point
44 assessments

Sujetas a evaluaciones : Después de comprobar que la innovación está dentro del ámbito de los objetivos de las 20 problemas de Time for the Planet y que ha alcanzado una madurez suficiente, se está evaluando la innovación.

immediately applicable in existing DC architecture

Lever of action
Energy efficiency
Energy
Discover our scope of action arrow_forward
Submission date 31 de octubre de 2021 Founders Job Witteman Development location Ede, Países Bajos

Detailed project

NB: this form is filled entirely by the ones submitting the innovation.

What is the issue addressed?

waste of energy in current DatCenter architecture

How is the problem solved?

immersive cooling saves at least 20 percent on energy plus residual heat can be used in local heat grids

What is the customer target?

the entire digital society, primarily the larger DC users such as cloud, hosting, bare metal providers or their users (booking.com, air france/klm, etc)

How is this solution different?

closed circuit immersive cooling in closed portable cassettes that fit in existing 19" racks